The new building works in this city zone are rapidly being followed by new infrastructure, so this site has become one of the most desirable, located as it is near the E-75 motorway with good connections to other cities in the country and region.
The manufacturing and commercial complex is the first phase of facilities on plots k.p.br.923 / 3 K.O. In the first phase, a production facility will be built with a warehouse for raw materials and an administrative section, auxiliary facilities and an internal road. The total gross area of the buildings is 18,982.90 m2, and the area occupied by the internal road is 6,816.11 m2. The facilities are being built for a specific user who manufactures components for the automotive industry and it is fully adapted to their needs.
This complex is located on the northern half of the site. One vehicle access has been designed from the existing public road on the north side of the plot, and a porter's lodge to control access to the complex is planned by the vehicle entrance at the building limit line.
Next to the porter's lodge there is also a pedestrian entrance for the staff. The whole complex is surrounded by a transparent fence 2.2m high. Parking for light vehicles is provided on the site inside the fence. The total number of parking spaces for passenger vehicles corresponds to the planned number of staff.